Jiangsu New Water Environmental Science & Technology Lo.,Ltd. Professional in environmental water treatment projects!
  • 1
  • 2
  • 3
Sewage treatment equipment
Water supply (circulating water) treatment equipment
Air purifying device
Packing and hydraulic parts
Jiangsu New Water Environmental Science & Technology Lo.,Ltd.
Add:No.2097,73 hit,international environmental protection city,Yixing
Zip:214214
Contact:Mr.Yang
Mobile:013861547990
Tel:+86-0510-87833756、013861547990
Technical support:013701534499
Fax:+86-0510-87836958
E-mail:djh1534499@163.com
http://www.jsnewwater.com
 
 
● NEWS
 
Flocculation mixer is suitable for water supply and drainage technology
Posted by:admin Published:2015/11/10 Reading:4569Times

Flocculation mixer is suitable for the coagulation process of water supply and drainage process of the reaction stage, so that the flocculation of colloidal particles to form a larger particle in favor of precipitation. The low speed frame structure, also can adopt frequency conversion, so that each reaction process with stirring intensity is needed, in order to adapt to changes in water quality and quantity, and so there is sufficient time to complete the reaction process, to reach the ideal effect.
Equipment installation:
1 before installation should check the location of embedded parts is correct, if not in the proper position should be adjusted after installation;
2 before the installation of the motor, reducer, other parts are in good condition, the size of the installation is consistent with;
3 tools ready, in any case, prohibit the use of hammer motor and reducer;
4 assembly surface coated with the right amount of grease;
5 motor and reducer can be used in place gasket to ensure the verticality of the stirring shaft and connecting the coaxial position;
Trial run:
1 check the oil level is appropriate, unscrew the oil level plug to observe whether there is no outflow of oil outflow should be added;
2 check the power supply is consistent with the motor nameplate, according to the instructions;
3 first no-load running for more than 1 hours, observation equipment, motor, reducer, mixing parts of the operation, to see whether the abnormal situation; found abnormal immediately shut down maintenance;
4 to be unloaded after the normal operation can be loaded, and pay attention to the observation of the operation;
Maintenance and maintenance:
1 make the necessary periodic inspection and maintenance system;
During the trial of 2 reducer monthly level and quality and timely supplement, every six months to replace a new gear oil;
3 during the trial if found abnormal vibration, heating up, the noise situation should be promptly shut down for maintenance

 
 
Contact Us
Add:No.2097,73 hit,international environmental protection city,Yixing
Contact:Mr.Yang
Mobile:013861547990
Tel:+86-0510-87833756、013861547990
Technical support:013701534499
Fax:+86-0510-87836958
E-mail:djh1534499@163.com
COPYRIGHT:Jiangsu New Water Environmental Science & Technology Lo.,Ltd. TEL:+86-0510-87833756、013861547990 苏ICP备11073609号